Our Build Process

Book Consultation

Typically, we aim to complete the build process within 4-6 months depending on design and site requirements. If you are planning a small, stick-built studio space, this can take as little as 1-2 months!

Our Step by Step process

Step 1: Site Prep

Step 1: Site Prep

Step 1: Site Prep

We start with a clean slate, preparing your land with precision for the foundation of your new ADU.

Step 2: Layout

Step 1: Site Prep

Step 1: Site Prep

Outlining your ADU's blueprint on the ground, we mark the territory where your dream will take shape.

Step 3: Framing

Step 1: Site Prep

Step 4: Close-in

Like a skeleton, we build your ADU's sturdy frame, giving it structure and form.

Step 4: Close-in

Step 6: Finishes

Step 4: Close-in

We seal the envelope, installing a weather-tight roof, windows, and doors, setting the stage for interior magic.

Step 5: MEP

Step 6: Finishes

Step 6: Finishes

Your ADU's veins and arteries - plumbing, electrical, and HVAC systems - are expertly installed and tested.

Step 6: Finishes

Step 6: Finishes

Step 6: Finishes

The final brushstrokes in your ADU's portrait come with painting, flooring, and fixtures, turning the construction into a home.

The full play-by-play!

Step 1: Site Preparation

Objective: Prepare the ground for construction, ensuring a solid foundation for the ADU build.

  • Clearing and Excavation:
    • Remove any unwanted structures, debris, and vegetation.
    • Excavate to the required depth for foundation work, following the site plan specifications.
  • Grading and Leveling:
    • Grade the site to ensure proper drainage away from the ADU structure.
    • Level the site to provide a stable base for the foundation.
  • Foundation Setup:
    • Install footings and foundation according to engineering specifications, whether it be slab-on-grade, crawl space, or a basement foundation.
    • Allow time for any poured concrete to cure properly.

Step 2: Layout

Objective: Outline the ADU's footprint and ensure accuracy in the structure's dimensions.

  • Marking the Build Area:
    • Use surveying equipment to mark out the exact dimensions of the ADU on the site.
    • Establish reference points for the corners of the building and major features.
  • Foundation Work:
    • Begin construction of the foundation walls and footers, ensuring they are level and square.
    • Install anchor bolts or straps that will secure the frame to the foundation.

Step 3: Framing

Objective: Construct the skeleton of the ADU, forming the basis for its structure.

  • Wall Construction:
    • Assemble the wall frames on the ground and then lift them into place.
    • Secure the frames to the foundation and to each other.
  • Floor and Roof Systems:
    • Install floor joists, sub-flooring, and the main floor.
    • Construct the roof trusses and sheathing.
  • Exterior Doors and Windows:
    • Frame out openings for doors, windows, and any skylights.

Step 4: Close-in

Objective: Seal the building from the elements to allow for interior work to proceed in any weather.

  • Roofing and Siding:
    • Add roofing materials to make the roof watertight.
    • Install siding material on exterior walls.
  • Windows and Doors:
    • Install exterior windows and doors.
  • Insulation:
    • Place insulation in the walls, floors, and attic space as required for energy efficiency.

Step 5: MEP (Mechanical, Electrical, and Plumbing)

Objective: Install essential services to make the ADU functional and livable.

  • Rough-In:
    • Install plumbing lines, sewer, and water supply.
    • Run electrical wiring and place outlet boxes.
    • Set up HVAC systems if applicable.
  • Inspections:
    • Have inspections completed for plumbing, electrical, and mechanical systems to ensure compliance with codes.
  • Insulation and Drywall:
    • Install remaining insulation and hang drywall.
    • Tape and finish drywall for a smooth surface.

Step 6: Finishes

Objective: Complete the interior and exterior details to turn the structure into a comfortable and attractive living space.

  • Interior Finishes:
    • Paint walls and ceilings.
    • Install flooring materials throughout the ADU.
    • Place trim work and finish carpentry details.
  • Cabinetry and Fixtures:
    • Install kitchen and bathroom cabinetry.
    • Set up fixtures in bathrooms and kitchens, including sinks, toilets, and faucets.
  • Final Touches:
    • Complete any exterior landscaping, decking, or hardscaping.
    • Conduct a final walk-through to ensure everything meets the client’s expectations and quality standards.
  • Final Inspections and Handover:
    • Arrange for final inspections by the local building authority.
    • Once approved, conduct a handover with the client, providing them with all warranties and instructions for their new ADU.